Proof Checking Consultancy Services of Four laning of the stretches from End of Borghat to Khopoli Rest House (Km.75/500 to 78/200) & from Khopoli to Khalapur (Km.79/300 to 84/400) in the state of Maharashtra on EPC Mode. Package No. 3/NH-04/2016.
Client: Maharashtra State Road Development Corporation Limited, Maharashtra
Preparation of Detailed Project Report Bridges of Six district in Bihar by Bihar Rajya Pul Nirman Nigam Limited, Bihar.
Client: BRPNNL, Bihar
Consultancy Services for Preparation and Submission of Detailed Project Report for ” Improvement of Diphu- Mijung- Arlongpharia- Lankaijan-Pranprangso, L=41.20 Km” under” Economic Lifeline Roads” in Karbi Anglong District of Assam.
Client: The Addl. Chief Engineer, PWD, Assam
Consultancy Services for Preparation of Detailed Project Report of Development and Operation of Chittorgarh -Neemach (MP Border) of NH-79 Section (Km. 183.000 to Km. 221.400) by Four Laning and Nimbahera- Pratapgarh of NH-113 Section (Km. 5.4000 to 80.000) by Two Laning in the State of Rajasthan through Public private Partnership (the “PPP”) on Design, Build, Operate and Transfer(DBFOT-Toll) basis.
Client: Chetak Enterprises Limited, Jaipur
Consultancy Services for Preparation of Detailed Project Report for Four Laning of Jam-Warora SH-264 from Km.0.000 to Km. 40.000” in the State of Maharashtra on BOT basis.
Client: Chetak Enterprises Limited, Jaipur
Consultancy Services for Preparation of Detailed Engineering Design Report and Construction Supervision of Upgrading of D153 from Great East Road at Moono Police Check Point Via Palabana to D 151 at Chilyabale Basic School ( 54Km) road in Lusaka Province of Zambia ( Total Length=74 KM)”.
Client: Chetak Zambia Limited, Lusaka, Zambia
Consultancy Services for Preparation of Detailed Engineering Design Report and Consultancy Supervision of the Upgrading of 113km of the Samfya to Kasaba via Lubwe (D096) Road in Luapula Province – Lot 1 in Zambia (Total Length=74 KM).
Client: BSBK Limited, Lusaka, Zambia
Consultancy Services for Preparation of Feasibility Report Two Laning with Paved Shoulders including Strengthening of Nashik-Peth Section from Km 11/600 to Km 65/600 of National Highway No. 848 in Nashik District in the State of Maharashtra (to be implemented under EPC Mode).
Development/Up-gradation to Two Lane with Paved Shoulder/Four Laning Configuration of Wakan-Pali-Khopoli Road (SH-93) (New NH) from Km 0/000 to Km 41/000 in the State of Maharashtra on EPC Mode Under NHDPR.
4 laning of RAIPUR – KODEBAD Section, Package-I ( Km 3.400 km To Km 43.400) of NH-43 under NHDP Phase-IV on EPC mode in the State of Chhattisgarh.
Consultancy Services for Preparation of Feasibility Report for Development and up gradation of Dhar-Nagda (SH-31) road in the State of Madhya Pradesh (the “project”) through Public-Private- Participation on Build, Operate and Transfer (BOT) basis under Madhya Pradesh Road Development Corporation Limited (MPRDC).
Consultancy Services for Feasibility Study for Pre-Tendering of Two Laning with paved shoulders of Chas-Ramgarh section of NH-23 from Km. 0.000 to Km. 78.315 in the state of Jharkhand through Public- Private-Patnership on Design, Build, Finance, Operate and Transfer (Toll) Basis under NHDP Pahse-IV under NHAI, New Delhi.
Consultancy Services for Feasibility Study for Pre-Tendering for Four- Laning/Two-Laning with paved shoulders of Govindpur (Rajganj)- Chas-West Bengal Border section of NH-32 from Km.0.000 to Km.56.889 in the state of Jharkhand through Public-Private-Patnership (PPP) on Design, Build, Finance, Operate and Transfer (Toll) basis under NHAI, New Delhi.
Consultancy Services for Feasibility Study for Pre-Tendering for Rehabilitation and Upgradations to 2 Lane with paved shoulders configuration of Existing 2 Lane Road of Padhi to Dahod section of NH-113 in the state of Rajasthan & Gujarat on DBFOT (Annuity) Basis under NHDP Pahse-IVB under NHAI, New Delhi.
Consultancy Services for Feasibility Study for Pre-Tendering for TwoLaing of Jhalawar-MP/Rajasthan Border section of NH-12 (from Km.346.540 to Km. 412.000 of NH-12) in the state of Rajasthan to be executed as BOT (Annuity) project on DBFOT pattern under NHDP IVB under NHAI, New Delhi.
Consultancy Services for Feasibility Studies for Pre Tendering for Two Laning with paved shoulder from Karauli KM 83.960 TO Dholpur KM186.750 of NH 11B in the state of Rajasthan under NHDP Phase IV A on DBFOT basis as BOT (Annuity ) Projectunder NHAI, New Delhi
Consultancy Services for review the existing pavement design & providing the alternate crust design Report for Six Laning of Panipat- Jhalandhar section of NH-1 from Km. 96.000 to Km. 387.10 in the state of Haryana & Punjab on DBFOT Basis under Phase-V under NHAI, New Delhi.
Consultancy Services for review the existing pavement design & providing the alternate crust design Report for Construction of Internal Roads & Coal Stock Yard for 3300 MW Tiroda Thermal Power Project of M/s. Adani Maharashtra Power Limited, Tiroda, Maharashtra.
Consultancy Services for Preparation Detailed Project Report for Construction of Township & Internal Roads, Storm Water Drainage network & Allied works for R & R Colony, Sasan Coal Mines of Reliance Sasan Power Limited-Coal Mines, Singrauli, Madhy Pradesh
Consultancy Services for Preparation Detailed Project Report for Construction/Upgradation of Bijapur–Tumnar(11Km) in DantewadaDistrict, Barsoor-Muchnar (5.48Km) in Dantewada District & Bakrupara-Kondagaon (1.30Km) in Bastar District of Chhattishgarh Rural Road Development Agency under Pradhan Mantri Gram SadakYojna, Chhattishgarh.
Consultancy Services for review the existing pavement design & providing the alternate crust design Report for Six Laning of Varanasi to Aurangabad section of NH-2 from Km. 786.00 to Km. 978.400 in the State of Uttar Pradesh and Bihar on DBFOT (Toll) Basis under NHDP Phase-V under NHAI, New Delhi.
Consultancy Services for Preparation Detailed Project Report for Improvement of Road from Maitissogaon to Handloom training Centre at Bhoksong (0.60 Km), Improvement of Road from DighaliPukhuri to RengkhangGaon via Jukuta, Beltola, Atigaon and Jarthangnalla (7.32Km) & Improvement of Road from Tumprop to Rongjangphong and Tongclock (1.90 Km) under PWD, Umpanai Division, KarbiAnglong, Assam.
Construction of Chhawrtui to Vanchengpui Road (4.80 Km) in Serchip District, Khamrang to Mualkhang Road (8.00 Km) in Kolasib District, Lengpui to Hmunpui Road (17.00 Km) in Mamit District, Thingfal to Mamte Road (10.59 Km) in Lunglei District &Zawlnuam to Zawlpui Road (9.00 Km) in Mamit District under PMGSY, Mizoram.
Consultancy Services for Preparation Detailed Project Report for Construction of Road from Domokial to Boralimara via Patharichuk Road (9.94 Km) and 29th K.M of NLKB road to Jengraimukh via Kulamua (5.51 Km) under PMGSY, Lakhimpur District, Assam.