Projects

Legends of Completed Project

31 delivered consultancy assignments across India, Myanmar and Zambia.

  1. 01
    DDC Completed

    4-laning, Lahoal–Chabua Bypass (NH-37), Assam (Package 2, EPC)

    NHIDCL · EPC: JKM Infra, Guwahati, Assam

    Assam · Km 606+300 to 626+030

    Detailed Design Consultancy Services for widening / improvement to 4-lane with paved shoulder from Km 606+300 to Km 626+030 of NH-37 on the existing Lahoal–Chabua Bypass (Package 2), Assam, on EPC mode.

  2. 02
    DDC Completed

    4-laning, Ganpath Gaur Gaon–Kwaram Taro (NH-29), Assam (Package 5, EPC)

    NHIDCL · EPC: BKSONS, Guwahati, Assam

    Assam · Km 95.400 to 113+330

    Detailed Design Consultancy (DDC) Services for widening / improvement to 4-lane with paved shoulder from Km 95.400 to Km 113+330 (design Km 96+400 to Km 113+800), near Ganpath Gaur Gaon to near Kwaram Taro village section (Package 5) of NH-29, Assam, on EPC mode.

  3. 03
    DDC Completed

    4-laning, Parokhuwa–Dokmoka (NH-29), Assam (Package 2, EPC)

    NHIDCL · EPC: Apex Structure, Indore, Madhya Pradesh

    Assam · Km 51+246 to 66+000

    Detailed Design Consultancy Services for widening / improvement to 4-lane with paved shoulder from Km 51+246 to Km 66+000 (design chainage 50+710 to 65+923) of the Parokhuwa–Dokmoka section (Package 2) of NH-29, Assam, on EPC mode.

  4. 04
    DDC Completed

    Road Over Bridge at Lumding Yard, Assam

    Chief Engineer, PWD, Guwahati, Assam · EPC: Anupam Nirman

    Assam

    Detailed Design Consultancy Services for construction of a ROB at Lumding Yard railway level crossing gate No. ST-50, on the road from the Lumding Railway Manager's office to Lumding Railway Station south entrance and to the Railway Stadium near Horlangfur Bridge, Assam.

  5. 05
    DDC Completed

    4-laning, Hapachara–Tulungia (NH-117), Assam (Bharatmala, EPC)

    NHIDCL · EPC: BKSONS, Guwahati, Assam

    Assam · 14.66 km

    Detailed Design Consultancy Services for construction and up-gradation to 4-lane of the existing 2-lane with paved shoulder, Hapachara to Tulungia road of NH-117, existing Km 0.00 to 14.050 (design Km 0.000 to 14.660, design length 14.660 km), Assam, on EPC basis under Bharatmala Pariyojana in economic corridors.

  6. 06
    DPR Completed

    Two-laning, Morigaon to Indo-Bhutan border, Assam — including 9.4 km bridge over the Brahmaputra

    Chief Engineer, PWD (NH Works), Guwahati, Assam — under R.O. MoRTH, New Delhi

    Assam · incl. 9.4 km bridge

    Consultancy Services for feasibility study and preparation of the Detailed Project Report for two-laning from Morigaon to the Indo-Bhutan border, Assam, including a 9.4 km long bridge over the river Brahmaputra.

  7. 07
    DDC Completed

    Widening, Mokokchung–Chare via Dikhu, Nagaland (EPC)

    PWD (NH), Guwahati, Assam · EPC: UCN

    Nagaland

    Detailed Design Consultancy Services for widening of the existing single-lane road to intermediate-lane road from Mokokchung to Chare via Dikhu, Nagaland, on EPC mode.

  8. 08
    DDC Completed

    Pavement reconstruction, NH-315A Jeypore–Hukanjuri (17.98 km), Assam

    PWD (NH), Guwahati, Assam · EPC: UCN

    Assam · 17.984 km

    Detailed Design Consultancy Services for reconstruction of pavement from Ch. 47+95 km to Ch. 65+934 km (length 17.984 km) of NH-315A (Jeypore to Hukanjuri), Assam.

  9. 09
    DDC Completed

    Road Over Bridge at Km 843, NH-17/NH-31, Abhayapuri, Assam

    PWD (NH), Guwahati, Assam · EPC: Macrocosm

    Assam

    Detailed Design Consultancy Services for construction of a ROB and its approaches in replacement of the existing level crossing at Km 843.205 of NH-17 (New) / NH-31 (Old), under Abhayapuri Construction Division, Assam.

  10. 10
    DDC Completed

    Widening to 2-lane, NH-61 (New NH-02), Nagaland

    PWD (NH), Assam · EPC: JKM Infra

    Nagaland · Km 135–147 & 156–168

    Detailed Design Consultancy Services for widening of the existing single / intermediate lane to 2-lane from Km 135.00 to Km 147.00 and Km 156.00 to Km 168.00 of NH-61 (New NH-02), Nagaland.

  11. 11
    Authority's Engineer Completed

    Authority's Engineer — NH-548D rehabilitation & up-gradation, Maharashtra (Package-33)

    MSRDC, Mumbai, Maharashtra

    Maharashtra

    Consultancy Services as Authority's Engineer for supervision of rehabilitation and up-gradation to 2-lane with paved shoulder / 4-lane standards of the National Highway section from Ahmedpur to Pimpla junction to Chumbhali Phata of NH-548D, on EPC basis (Package-33).

  12. 12
    DDC Completed

    Strengthening & widening, NH-39 (Km 46–54), Assam (EPC)

    PWD (NH), Assam · EPC: JKM Infra

    Assam · 8 km

    Detailed Design Consultancy Services for strengthening with widening to paved shoulder from Km 46+000 to Km 54+000 of NH-39, Assam, on EPC mode.

  13. 13
    DDC Completed

    Strengthening, NH-153 (0–23.7 km)

    JKM Infra, Guwahati, Assam

    23.700 km

    Detailed Design Consultancy Services for strengthening of the existing road including slope & uphill protection from Ch. 0.00 to 23.700 km (length 23.700 km) of NH-153, under Annual Plan 2020-21.

  14. 14
    Proof Consultancy Completed

    69 bridges, Tamu–Kyigone–Kalewa, Trilateral Highway, Myanmar

    NHAI, Regional Office, Guwahati, Assam

    Myanmar · 149.7 km, 69 bridges

    Preparation of the Detailed Project Report for construction of 69 bridges including approach roads on the Tamu–Kyigone–Kalewa road section from Km 0.00 to Km 149.70 of the Trilateral Highway in Myanmar.

  15. 15
    DPR Completed

    Major Bridge at Km 12+865, Shillong Bypass (NH-28), Meghalaya

    Shillong Expressway, Meghalaya

    Meghalaya

    Detailed Project Report of a major bridge at Km 12+865 of the project highway comprising National Highway 28 of the Shillong Bypass, Meghalaya.

  16. 16
    DDC Completed

    Strengthening with paved shoulders, NH-427 (0–12 km), Assam

    Chief Engineer, PWD, Guwahati, Assam · EPC: Anupam Nirman

    Assam · 12 km

    Detailed Design Engineering Services for strengthening with paved shoulders from Km 0.00 to Km 12.00 of NH-427, Assam.

  17. 17
    DDC Completed

    Widening & strengthening, Barpeta–Baghbar Road (SH-2), Assam (EPC)

    Chief Engineer, PWD, Guwahati, Assam · EPC: Macrocosm

    Assam · to Km 28.4

    Detailed Design Consultancy Services for widening and strengthening of Barpeta–Baghbar Road starting from Ch. 900 m (Ch. 56.94 km of SH-2) to 28400 m at Baghbar Bazar, under the scheme of Assam, on EPC mode.

  18. 18
    DDC Completed

    Strengthening, Lonand–Satara (NH-965D), Maharashtra

    Executive Engineer, PWD, Pune, Maharashtra · EPC: Real Infra

    Maharashtra · Km 0/000 to 44/000

    Consultancy Services for Detailed Design Consultancy for strengthening the existing road from Km 0/000 to 44/000 on the Lonand–Satara section of National Highway No. 965D, Maharashtra.

  19. 19
    DPR Completed

    Emergency Landing Facility, Moran Bypass (NH-37), Assam

    NHAI, Regional Office, Guwahati, Assam

    Assam · Km 550+500 to 554+800

    Preparation of the Detailed Project Report for emergency landing facilities on National Highways — Moran Bypass (new alignment) section from Km 550+500 to Km 554+800 of National Highway 37, Assam.

  20. 20
    DDC Completed

    Road Over Bridge at LC SK/24, Barkura, Nalbari, Assam

    Chief Engineer, PWD, Guwahati, Assam · EPC: Anupam Nirman

    Assam

    Detailed Design Engineering Services for construction of a ROB over the rail track at level crossing No. SK/24, at Barkura, Nalbari, under construction of ROBs in the state of Assam.

  21. 21
    DDC Completed

    Road improvement, Shrirampur–Washim–Pusad (SH-51), Maharashtra

    Chief Engineer, PWD (NH), Mumbai, Maharashtra · EPC: R.B. Ghodke

    Washim & Yavatmal, Maharashtra · Km 242/200 to 298/249

    Detailed Design Engineering Services for improvement of the road from Shrirampur–Vaijapur–Risod–Washim–Pusad–Mahagaon–Fulsawangi–Mandvi Road, Km 242/200 to 298/249 (section of SH-51, Washim to Pusad Shivaji Chowk), districts Washim & Yavatmal, Maharashtra.

  22. 22
    DDC Completed

    Strengthening with paved shoulder, NH-52 (New NH-15), Assam

    Executive Engineer, PWD, Assam · EPC: Sweety Infrastructure

    Assam · 22 km

    Preparation of the Detailed Project Report for strengthening with construction of paved shoulder from Km 135/00 to 138/00, Km 157/00 to 171/00 and Km 177/00 to 182/00 of NH-52 (New NH-15), Assam.

  23. 23
    DDC Completed

    Nampur–Satana–Vani (SH-27) & Nashik–Dindori–Vani (MSH-3), Nashik, Maharashtra

    Chief Engineer, PWD, Nashik, Maharashtra · EPC: HPM Infra

    Nashik, Maharashtra

    Detailed Design Consultancy for (NSK-54B) improvements to Nampur–Satana–Kalwan–Vani–Pimpalgaon–Niphad–Sinnar road, SH-27, Km 0/00 to 73/800 (Nampur to Vani), and (NSK-54A) improvement to Nashik–Dindori–Vani, MSH-3, Km 10/500 to 42/500, district Nashik, Maharashtra.

  24. 24
    DDC Completed

    Top Wadgaon–Arwade (SH-151), Sangli, Maharashtra (Part I)

    Executive Engineer, PWD, Sangli, Maharashtra · EPC: Coolroc

    Maharashtra · Km 0/000 to 63/000

    Detailed Design Consultancy Services for improvements to Top Wadgaon–Shigaon–Ashta–Tasgaon–Bhivghat–Atpadi–Dhighachi Road, SH-151, Km 0/000 to 127/950 (Part I: Top to Arwade, Km 0/000 to Km 63/000), Maharashtra.

  25. 25
    DDC Completed

    Vita–Kokrud (SH-150), Sangli, Maharashtra (Hybrid Annuity)

    Executive Engineer, PWD, Sangli, Maharashtra · EPC: Coolroc

    Sangli, Maharashtra · Km 0.000 to 83.700

    Detailed Design Consultancy Services for improvement to Vita–Peth–Malkapur–Anuskura–Satavali–Pavas, SH-150 (district border to Anuskura district border), Km 0.000 to Km 84.000, district Sangli — section Vita to Kokrud, Km 0.000 to Km 83.700 — on Hybrid Annuity basis, Maharashtra.

  26. 26
    DDC Completed

    4-laning, Solapur–Maharashtra/Karnataka border (NH-9), Maharashtra (DBFOT)

    NHAI · EPC: STPL, Solapur, Maharashtra

    Maharashtra · 100.060 km

    Preparation of the Detailed Project Report for four-laning of the Solapur–Maharashtra/Karnataka border section of NH-9 from Km 249+000 to Km 348+800 (100.060 km), Maharashtra, on DBFOT basis under NHDP Phase-III.

  27. 27
    DDC Completed

    Khopoli Bypass Road, Maharashtra

    MMRDA · EPC: Monica Construction

    Maharashtra

    Detailed Design Consultancy Services for construction of the Khopoli Bypass Road, Maharashtra.

  28. 28
    DDC Completed

    Samfya–Kasaba via Lubwe (D-096), Luapula Province, Zambia (Link Zambia 8000)

    Road Development Agency (RDA), Lusaka, Zambia · EPC: BSBK

    Luapula Province, Zambia · 113 km

    Consultancy Services for preparation of the detailed design for upgrading of 113 km of the Samfya to Kasaba via Lubwe (D-096) road in Luapula Province (Lot 1), under the Link Zambia 8000 paved road programme, Zambia.

  29. 29
    DDC Completed

    Upgrading D153, Moono–Palabana–Chilyabale, Lusaka Province, Zambia

    Road Development Agency (RDA), Lusaka, Zambia · EPC: Chetak

    Lusaka Province, Zambia · 74 km

    Consultancy Services for detailed design engineering of upgrading of D153 from the Great East Road at Moono Police Check Point via Palabana to D151 at Chilyabale Basic School road, Lusaka Province, Zambia (total length 74 km).

  30. 30
    DPR Completed

    Four bridges — site selection, survey, design & project report, Mizoram

    PMGSY / PWD Aizawl (Govt. of Mizoram)

    Mizoram · 4 bridges

    Study for site selection, detailed engineering survey, geotechnical / hydrological investigation, selection of proposed bridge type, and detailed design & project report for bridges in the state of Mizoram (04 bridges).

  31. 31
    DPR Completed

    Bridges (Package-II) — site selection, survey, design & project report, Mizoram

    PWD, Govt. of Mizoram, Aizawl

    Mizoram · 12 bridges

    Study for site selection, detailed engineering survey, geotechnical / hydrological investigation, selection of proposed bridge type, and detailed design & project report for bridges in the state of Mizoram (Package-II, 12 bridges).